Domain 7

Objective 7.12

Testing disaster recovery plans

Continuity is bigger than restoring servers

Disaster recovery brings systems back. Business continuity keeps the organization functioning.

Business impact analysis

What must continue, and how soon?

Recovery strategy

Where and how will we work?

Plan

Who does what, in what order?

Exercise

Practice before the real day.

What it is

A plan you have not practiced is a theory. Tests range from gentle to disruptive. A checklist or walkthrough reads the plan and looks for gaps. A tabletop talks through a scenario in a room. A simulation goes further without moving the real business. A parallel test brings the alternate site up without leaving the primary. A full interruption test actually fails over production. Each step costs more and proves more. You start gentler, fix what you learn, and earn the right to riskier tests. People, vendors, and phone numbers fail these tests more often than fancy software.

Why it matters

Untested failovers fail on the day, usually on a forgotten credential or a network rule. Full interruption proves the most and can cause the disaster you were rehearsing, so it needs executive acceptance and a back-out. Never testing the disruptive parts at all leaves you with a binder. Findings must change the plan. A test that produces no edits probably did not look hard.

A simple example

Reading the fire-escape map is a walkthrough. Sitting the family at the table and asking “what if the stairs are blocked?” is a tabletop. Starting the spare car in the driveway without leaving town is closer to parallel. Actually moving everyone to the other house for the night is a full interruption. You do not start with the overnight move if you have never checked that the spare key exists.

On the exam

Name the test by how much production is touched. Reading is not a parallel test. Parallel is not full interruption. The best answer is often the strongest test the business can safely accept, not always the strongest test that exists. A trap is a successful tabletop being reported as proof the hot site will run. It proves the conversation worked.

Words worth keeping

Tabletop
A discussion of a scenario used to find gaps without moving real operations.
Parallel test
The alternate site is started while production stays at the primary.
Full interruption
A test that actually moves live operations, with real impact if it fails.